April 2007 Construction

April 11th, 2007: The kitchen island and its mirror image on the ceiling above it. 
April 11th, 2007: Arches on the back patio. The pattern of the big arch is a reoccurring pattern throughout the entire house design. 
April 11th, 2007: Arch windows in the garage facing the street.
April 11th, 2007: This is a view from the roof, looking down into the courtyard.

April 11th, 2007: View of the entry portal from the roof, looking down into the courtyard.

April 11th, 2007: This part of the roof is flat, which makes it an ideal place to install the solar PV panels because they wont be visible from the ground.  
April 14th, 2007: The fireplace in the great room. This is an enclosed gas fireplace, which we had to use due to "no burn" restrictions.
April 25th, 2007: Part of the back patio. The pre-stucco covering goes up.
April 25th, 2007: Preparing for the spiral straiway from the pantry to the rathskeller.
April 25th, 2007: Roof tiles get delivered. These roof tiles are very pale with salmon, white,and grey.


April 30th, 2007: View of the northwest corner with the pre-stucco covering.
April 30th, 2007: View of the northeast corner.
April 30th, 2007: View of the southwest corner.
April 30th, 2007: View of the southest corner.