May 2007 Construction

Completed in May:
Electrical
Low voltage
Duct work for Heating / Air conditioning
Insulation
Drywall
Stucco

May 9th, 2007: I felt like I needed to contribute something to the construction so I installed all of the network and audio cable. This ended up taking 4 full days (much more than I had anticipated), running cable up from the server room in the basement to all parts of the house. When I finished, I had run 1500 ft. of cat6 for gigabit ethernet, 200 ft. of cat6 for PoE (power over ethernet) for the security system, and 800 ft. of 14 gauge CL3 audio cable. The audio systems will include a 9-speaker 5.1 Dolby system for the kitchen and patio, a 5-speaker 5.1 Dolby system for the master suite, and a 7-speaker 7.1 enhanced Dolby system for the basement.

May 9th, 2007: Termination point for all the cat6 ethernet drops in the server room in the basement.  It's a bit messy but it will look a lot better when I install the wall-mount rack for the  patch panels and switches.

May 9th, 2007: Its a good thing that I got all the wiring done when I did because all the insulation went in a few days later. This is the stairwell from the Great Room to the basement.

May 19th, 2007: The stucco starts going up. This is the East-facing entrance to the courtyard and casita.

May 19th, 2007: The flat overhang was a little bland so we had corbels added to match the reoccurring theme throughout the house.

May 19th, 2007: The drywall goes up after the insulation is put in. This is one of the hallways from the garage to the common rooms.

May 19th, 2007: Back patio stucco and drywall.

May 19th, 2007: Great Room drywall.

May 19th, 2007: Kitchen drywall.

May 19th, 2007: View of the back patio from the Master Suite.

May 26th, 2007: This is the underside of the overhang leading to the courtyard and the casita entrance. The beams will be left exposed but sealed to protect from the weather.

June Construction
Back to April ..