July 2007 Construction

Completed in July:
Interior paint
Kitchen countertop tile
Boys' bathroom tile
Laundry room tile
Master bath tile
Front door
Spiral stairwell
Solar energy array
Garage doors and openers
RV gates

July 4th, 2007: Part of the wall between the dining room and the pantry had to be temporarily removed because of the discovery that the spiral staircase would arrive fully assembled rather than in pieces  and assembled on-site, which was the initial expectation.
July 14th, 2007: Installation on the countertops continues. This is one of the kitchen islands.

July 14th, 2007: The front door is delivered and installed. The wood is a knotty alder like the cabinets but still needs a coat of finish.

July 17th, 2007: Saltillo floor tile is delivered. These are 16" x 16" tiles designed to provide an "old world" look. Saltillo tile is difficult to seal and maintain but I think it has much more character than modern porcelain tile.

July 17th, 2007: 16 solar panels are installed on the flat part of the roof surrounding the courtyard. I had to go up on the roof to see them because they cannot be seen from the ground. These panels will provide approximately 3000 kilowatts - hopefully enough to minimize the need for power from the city grid.

July 17th, 2007: The spiral straircase gets delivered. This staircase is black wrought iron and took about 10 guys to move it from the trailer and drop it in the hidden stairwell.

July 17th, 2007: The spiral staircase gets installed.

July 22nd, 2007: The gaping hole from the spiral staircase installation gets repaired.
July 22nd, 2007: Visited the house after a monsoon storm and found that the retention in the back yard is doing its job.

July 22nd, 2007: Glass brick is installed in the basement bathroom wall. This was done to let in some natural light from the adjacent light well. This is also the first glimpse at the yellow/orange color scheme in the basement.

July 22nd, 2007: Tile work in the boys' bathroom.

July 22nd, 2007: Tile work almost completed in the master bath shower.

July 22nd, 2007: Garage doors and openers installed.

July 22nd, 2007: Outside view of the new garage doors. After a rain, this is also a discovery that the proposed driveway also retains a lot of water.

July 25th, 2007: RV gates are installed. I don't have an RV, nor do I intend on acquiring one, but these wide gates will allow vehicles into the back yard. These are the north gates - there is another RV gate on the south side of the house.

July 25th, 2007: Safety fence around the light well so people dont accidently fall in. There is also a ladder in case people in the basement need to make a quick escape when the Federales show up.