August 2007 Construction

Completed in August:
Courtyard gate and wrought iron
Saltillo floor tile
Tubs, sinks, and plumbing
Exterior lights
Interior paint
Interior lights
Ceiling fans

August 4th, 2007: Installation of the wrought iron front gate.  Simple design but functional, sturdy as hell, and provides an external, physical security perimeter in case druglord rivals try to storm the compound.

August 4th, 2007: A closer look at the tile and color scheme in the guest casita.

August 4th, 2007: Wrought iron stair bannister for the "non-hidden" stairs down to the basement.

August 4th, 2007: Installation of the saltillo tile begins. This is a view of the greatroom from the perspective of the north patio entrance. After installing the tile, the installers will treat it with linseed oil to give it a darker color.

August 4th, 2007: Another view of the saltillo installation from the south hallway. The nice thing about saltillo tile, from an installation perspective, is that it is easy to cut and shape for fitting around walls and corners. Unfortunately, for this reason it is also much more fragile than the more popular porcelain alternative.

August 7th, 2007: Outside lighting is installed. The wrought iron look was chosen to match the gates.
August 20th, 2007: A closer look at the saltillo tile from the entrance of the master suite into the north hall. The paint is new (yellow something) which adorns all the walls in the great room, kitchen, basement, and halls.
August 20th, 2007: A better view of the kitchen from the great room. This shows the ceiling islands, which mirror the islands beneath them.  The new paint gives the whole  space a warm glow.
August 20th, 2007: SRP finally digs the trench and drops cables to hook the house up to the city grid. 
August 23rd, 2007: Some of the more elaborate interior lighting. This chandelier is in the  front entryway. 
August 23rd, 2007: One of the bathroom sinks in the boys' bathroom. 
August 23rd, 2007: Tub and tile in the master suite bathroom.
August 23rd, 2007: One of the sinks in the master suite bathroom.
August 31st, 2007: Although the courtyard doesn't need to be finished to pass inspection, the entryway does need a threshold. They made this threshold out of left-over saltillo tile.
August 31st, 2007: The appliances arrive! This is a 5-burner gas cooktop. I found out today that the gas utility failed to install a gas stub on the property so they will probably need to bore under the street to get a gas stub to the property to hook up to the house.
August 31st, 2007: The refrigerator. Not pictured, there is also a dishwasher, built-in microwave, and an oven.
August 31st, 2007: This is a view of the bottom of the hidden spiral from the rathskeller. It is also an experiment in photography because there was very little light in the rathskeller and a flash normally would have been required. Instead, I decreased the shutter speed to take advantage of what little light there was.

August 31st, 2007: One of two simple vanity-sinks for the powder rooms. This powder room is off the south hall next to the kitchen. The other vanity-sink is in the powder room in the basement.

August 31st, 2007: Installation of the carpet begins. The only rooms with carpet are the boys' rooms and the basement. The boys wanted everything of theirs done in blue.

August 31st, 2007: The boys' bathroom tub. The tile matches the sinks.