September 2007 Construction

Completed in September:
Stone driveway
Saltillo tile stain and seal
Septic tank
Appliances (but some on back order)
Final plumbing installation and water ON
Final electrical installation and power ON

September 2nd,  2007: This is a BEFORE shot of part of the front yard before the driveway is installed.

September 12th,  2007: Preparation for installation of the paving stones for the driveway.

September 13th,  2007: Paving stones delivered, ready to install.

September 30th,  2007: Driveway installation completed. This is only part of the driveway - I eventually want to build a circular drive that wraps around from the mailbox (north entrance) to the courtyard entrance to the south entrance.

September 4th,  2007: Septic tank installation.

September 18th,  2007: Had to install a temporary path to the front door and casita entrance in order to pass inspection for a certificate of occupancy. Eventually, this whole courtyard will be paved with stone.

September 26th,  2007: A better view of the temporary path from the front door. This looks even better at night when the courtyard lights are all on.

September 21st,  2007: Because of the long, narrow shape of the dining room, had a table made to allow 8-10 people to sit comfortably while still being able to walk behind those seated without having to hug the wall. The table is 3 ft. wide by 10 ft. long, made of mesquite.

September 26th,  2007: Tile work around the fireplace. This actually isn't done yet - there is still a strip of cobalt blue tile to border the edges but it is on back order.

September 26th,  2007: Tile work on the kitchen backsplash. Also, the hood above the stone was installed. This retractable hood was an alternative to a classic, stainless steel restaurant exhaust hood, which now that I look at it, I would rather have. I'll give this a chance and maybe change it later on if this doesn't work out.

September 26th,  2007: Master suite closet. I couldnt get all of the closet because of the 90 degree bend. Before the electricity went on, I couldn't get a decent picture of this.

September 26th,  2007: Turning the corner in the master suite closet, this is the rest of it.


Move scheduled and cancelled! There were too many failed inspection items to allow occupancy. Construction STILL wasn't completed so .. October Construction coming soon

 

Construction Completed!